Student Accommodation On Waterfront

Student accommodation panic – the brief

When our engineer attended a Student Accommodation house to carry out routine maintenance for a new client, he found the control panel in pieces. He was able to re-assemble the panel and check the system over, and everything seemed in order. However, within 24 hours the panel was showing a fault, and it was discovered that there was a problem with the panel which couldn’t be resolved. A new control panel was the only option – “and one other thing”, the client says at this point, “we have an Environmental Health inspection in 48 hours”!

A laptop showing Fire Risk Assessment checklist onscreen

Solution

We hold a stock of the most commonly required fire alarm control panels, so by re-scheduling the work we were able to get an engineer on site within 24 hours. Results: One fire alarm system functioning again and fully checked – all ready for the inspection; and one very relieved client!

  • BAFE Logo
  • ISO 9001 Logo
  • Approved Contractor Logo

© DFP Global Ltd t/a Dorset Fire Protection 2017. All rights reserved. Company registered in England & Wales. Company number: 9637623.